All Pumps’ range of Aquaflo modular, underground water storage systems are made from robust, high-density polyethylene (HDPE) with storage capacities of 5,000L to 30,000L (or larger on request). Aquaflo’s modular design makes for almost unlimited configurations, suited to all types of ground installations. These underground water storage tanks are easily transportable and will withstand water pressure at depth, are easy to install with a one piece design. Depending on your application, Aquaflo underground water storage tanks can be connected in series and combinations to suit your storage needs, making them popular for water reuse and harvesting applications, water detention tanks, sewage pump stations and emergency sewage storage applications.
All Pumps has been manufacturing, supplying and servicing Aquaflo systems in Australia for 5 years.
Horizontal Models | Litres | "A" | "B" | "C" | Weight | Manhole |
---|---|---|---|---|---|---|
AF 5H | 5,000 | 3,500 mm | 2,150 mm | 1,900 mm | 400 kg | 1 @ 900 x 600 mm |
AF 7.5H | 7,500 | 4,500 mm | 2,150 mm | 1,900 mm | 550 kg | 1 @ 900 x 600 mm |
AF 10H | 10,000 | 5,500 mm | 2,150 mm | 1,900 mm | 700 kg | 1 @ 900 x 600 mm |
AF 15H | 15,000 | 7,500 mm | 2,150 mm | 1,900 mm | 950 kg | 1 @ 900 x 600 mm |
AF 20H | 20,000 | 9,500 mm | 2,150 mm | 1,900 mm | 1,200 kg | 1 @ 900 x 600 mm |
AF 25H | 25,000 | 2,150 mm | 2,150 mm | 1,900 mm | 1,400 kg | 1 @ 900 x 600 mm |
AF 30H | 30,000 | 13,500 mm | 2,150 mm | 1,900 mm | 1,700 kg | 1 @ 900 x 600 mm |
Important
Only qualified personnel should install, operate and repair your Aquaflo Storage System. Any wiring of pumps or similar electrical equipment should only be performed by a qualified electrician. All specifications must be certified by the engineers/consultants and relative governing authorities before commencement of construction and installation.
The customer or installer is responsible for ensuring that the installation of this Aquaflo Storage System is in compliance with any regulatory requirements of the planning authorities, building control, Environmental Agency, Water Board and/ or National (AS/NZ) Standards. If ground water is likely to be present within the excavation, make sure all details for the correct installation procedure are followed – If in doubt, -contact the Engineers Department.
Safety Precautions
- Ensure the installer is aware of all “Confined Spaces” and “OH&S” guidelines.
- Make sure that there is sufficient oxygen and there are no poisonous gases present.
- Check the explosion risk before welding or using electrical tools.
- Do not ignore health hazards and observe strict cleanliness.
- Ensure all lifting equipment is in good condition and meets the relevant standards for the purpose.
- In case of any contamination, please ensure all personnel who work on the system are vaccinated against diseases that can occur.
- Always keep a first aid kit within easy reach.
Người gửi / điện thoại
Lê Đình Đinh HP: 0903 611 561
EMail 1: dinh.lk1987@gmail.com
Skype: ledinh2008
Website: bomnuoccongnghiep.mov.mn
www.ledinhtech.com